My wife finalized the concrete factory today, with only the slightest bit of feedback from me.
Not much to say, it’s a pretty slick build.
Then she made a start on iron works: Plate, Rod, and Screws.
Happy little accident of the miners poking up into the logistics floor, which we were able to just highlight and work around.
Me, I just spent my whole time plugging along on these belt lines. Good progress, just slow. I realized I actually was missing a blueprint, for a 4-meter incline segment, so I had to go develop that. Then I spent a bunch of time having to custom-build around the several junction points, but those should be the last hard part of this, and they’re done.
You must log in or register to comment.