Images are from the Northwest Power and Conservation Council’s interactive map.

The hydroelectric marker for Grand Coulee Dam is not to scale. It should be larger. If drawn to scale it would dwarf the nearby markers.

According to the overview, the map does not include small producers in order to limit the number of markers. For the following sources, only producers above the specified cutoffs are shown:

  • Hydropower: above 5 MW (Idaho) or 20 MW (other)
  • Natural Gas & Wind: above 10 MW
  • Biomass: above 1 MW
  • curiousaur@lemmy.fmhy.ml
    link
    fedilink
    English
    arrow-up
    2
    ·
    1 year ago

    Have you seen it lately? The Colorado River barely even reaches it anymore. The reservoir is like 300 feet lower than it was designed to run at.

    • jrs100000@lemmy.world
      link
      fedilink
      English
      arrow-up
      2
      ·
      1 year ago

      As of July 2023 production is down 35%, but its definitely still operating and producing significant amounts of power.

      Source